Determine the relative risk rating using the values, hazards, probability ratings (inputs) that were determined in steps 1 through 3 (follow instructions in the Relative Risk Assessment Guidance). Always document the logic and basis for choosing the rating in the notes section of the RRA.
Below is an example of the relative risk rating of an RRA. In this example, the SOPL determined the relative risk rating as "high."